Day ride: Slapton Sands
Following the riverside path at Totnes between Brutus Bridge and the railway bridge, 34.2 miles into the ride
Following the riverside path at Totnes between Brutus Bridge and the railway bridge, 34.2 miles into the ride (Taken by Michael on 25 Apr 2004, 17:30 using Sony DCR-TRV80E)
Back to Reports